|
Welcome back to From the Beehive!
Today, Sarah from St. Thomas Economic Development is literally between two trees on Burwell Road with a chilly—but important—update from the St. Thomas Megasite. She's joined by Michael Brix from the Industrial Development team for a brisk walk-through of the existing Burwell Pumping Station—affectionately dubbed "just a little guy"—and what’s coming next as part of the city's infrastructure upgrades. 💡 In this episode: 💧Why the current Burwell Pumping Station isn’t quite up to the task 💧Plans for a brand new pumping station to support Megasite and community growth wastewater flows 💧How construction will be staged to keep One Password Park (and the existing pump) fully operational during the upgrade 💧The timeline for construction and what residents can expect 💧This is one of the many behind-the-scenes steps making the St. Thomas Megasite a success! 📍 Don’t forget to like, subscribe, and follow us on Facebook to stay in the loop with all the latest from the Megasite and beyond. 📣 Got questions or want us to cover something specific? Drop a comment below!
0 Comments
Leave a Reply. |
Categories
All
Archives
November 2025
|
|
|