|
🌧️ Even when the site is a little quiet after a rainfall, there’s still big news to share from the St. Thomas Mega Site!
In this episode, Mike and Nathan take you to the top of a soil pile with a sweeping view of the Industrial Park to talk about one of the most significant stormwater projects on the site—"Pond 3," or as the team affectionately calls it, the "Über Pond." 💧 What you'll learn in this update:- Why this massive 35-acre stormwater pond is essential for the future of the site. - How it manages water responsibly by detaining and slowly releasing runoff. - The engineering behind designing for 100-year storm events while protecting downstream areas. - What the pond will (and won't!) be used for (spoiler: no water sports, but plenty of environmental benefits). This stormwater system is a crucial component in ensuring the Mega Site is prepared for industry while preserving the surrounding environment. 📍 Stay tuned for more Beehive updates as we keep building the future of St. Thomas together.
0 Comments
Leave a Reply. |
Categories
All
Archives
January 2026
|
|
|